{"id":6740,"date":"2025-05-28T07:36:34","date_gmt":"2025-05-28T07:36:34","guid":{"rendered":"https:\/\/lcm.web-email.at\/blog\/dynamic-measurements-in-crusher-operation\/"},"modified":"2025-08-13T08:18:29","modified_gmt":"2025-08-13T08:18:29","slug":"dynamic-measurements-in-crusher-operation","status":"publish","type":"post","link":"https:\/\/lcm.web-email.at\/en\/dynamic-measurements-in-crusher-operation\/","title":{"rendered":"Dynamic measurements in crusher operation"},"content":{"rendered":"\n
\n
<\/div>\n\n\n\n

Dynamic measurements in crusher operation<\/h2>\n\n\n\n
<\/div>\n\n\n\n
\n
\n
\"Picture<\/figure>\n<\/div>\n\n\n\n
\n

From the measurement concept to measurement on the construction site <\/mark><\/h3>\n\n\n\n

Among other things, RubbleMaster manufactures mobile crushing plants that can be used to break up and separate construction waste into its components so that it can then be reused as valuable raw materials in the construction process.<\/p>\n\n\n\n

In order to improve and validate the in-house calculation models, it was necessary to record the loads on the system using high-quality measurement technology.<\/p>\n\n\n\n

LCM was able to implement this measurement task quickly, proving that we do not shy away from harsh measurement environments.<\/p>\n<\/div>\n<\/div>\n\n\n\n

<\/div>\n<\/div><\/section>\n\n\n\n
<\/div>\n\n\n
\n\t\t
\n
\n\t\t\t\t\t\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\t\t

\n\t\t\t\t\t\t\t\tRequirements<\/mark>\t\t\t\t\t\t\t<\/h2>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t
\n\t\t\t\t\t\t\t\t